| 000 | 00819nam a2200241 i 4500 | ||
|---|---|---|---|
| 999 |
_c116328 _d116328 |
||
| 001 | C2-0315047 | ||
| 003 | PPAK | ||
| 005 | 20190626125812.0 | ||
| 008 | 120429s1982 xx a|||| ||||| | eng d | ||
| 040 |
_aPPAK _beng _cPPAK _erda |
||
| 082 | 0 | 4 |
_a625.72 _223 |
| 090 | 0 | 0 |
_a625.72 _bMAL _dKK |
| 110 | 2 | _aMalaysia, Ministry of Works and Utilities | |
| 245 | 0 | 0 |
_aDetailed survey and engineering design of the interurban toll highway between Butterworth and Changkat Jering Peninsular Malaysia: _bProgres Report |
| 264 | 1 | _c1982 | |
| 300 |
_a[14 pages] : _billustrations ; _c30 cm |
||
| 336 |
_2rdacontent _atext |
||
| 337 |
_2rdamedia _aunmediated |
||
| 338 |
_2rdacarrier _avolume |
||
| 650 | 1 | 0 | _aRoads - Design and construction. |
| 710 | 2 |
_aMalaysia, Ministry of Works and Utilities _eorganizer |
|
| 942 |
_cB _2ddc |
||